The Drill & Blast Offering

Written by Barry on Tuesday 8th December 2015

Phase 1:  Getting the Basics right (Using your energy efficiently)

  • Site Operations audit (data acquisition)
  • Set Operation benchmark
  • Operational Costs Analysis
  • Understanding the deficiencies (data analysis)
    • Correct and Implement
  • Blast Design Improvements
  • Blast Timing to achieve planned end result
    • Ore Movement
    • Slope Stability
    • Better Fragmentation

Potential Savings Range: 5-10%

Phase 2: Improving your Cost Base

  • Review Benchmark and update
  • Data driven adaptation
  • Improve drilling efficiencies
  • Drilling location improvements
    • Survey blast hole collar position
  • Correct Explosives Charge mass
  • Improved Stemming
  • Manual Fragmentation analysis
    • Blast face
    • Crusher Feed

Potential savings Range: 10-15%

Phase 3: Value Added Operations

  • High Precision GPS on drill rigs.
  • Online Fragmentation Analysis (Excavators, Crusher & Mill Feed Conveyors).
  • Immediate understanding if the downstream impact of a bad blast result.
  • Improved Crusher throughput.
  • Improved Milling rate.
  • Better wall conditions (Safer working environment), understand resonating frequencies of rock mass structures.
  • The use of electronic ore movement measurement systems.
  • The use of SUSA (Small Unmanned Surveillance Aircraft, or Drones).
  • The regular use of High Speed Imaging to monitor blasts.

Share this page:

Similar Articles